Bond Construction Update: Progress Continues Across Mesquite ISD

Construction continues across several Mesquite ISD bond projects, with renovation work at multiple campuses reaching important milestones while larger additions continue through structural, site, and systems work.
Here are the latest updates:
At North Mesquite High School, work continues on the building addition with structural steel, driveway preparation, underfloor plumbing, electrical conduit, ventilation, and roofing. Fire sprinkler rough-in is complete, and air handler and duct work in the penthouse are mostly complete as crews continue advancing the next phases of the addition.
At Beasley Elementary, several major renovation milestones have been reached. The new fire alarm installation and District cleaning are complete, and landscaping restoration is underway. Remaining rooftop unit work is in progress. Earlier work also included completed electrical switchgear and fire sprinkler water line installation, along with ceiling improvements throughout most of the building.
Gray Elementary is nearing completion, with final mechanical and electrical work underway. Heating water equipment and low-voltage building controls continue, while the Area C fan coil unit and ceiling tile replacement have been completed. An architectural punch walk was also completed in August.
At Moss Elementary, crews continue work on boiler and pump piping. Electrical renovations, fan coil unit installation, and ceiling grid and tile replacement have been completed. The campus has also moved through an architectural punch walk.
Construction at the Horn High School Fieldhouse is advancing from underground work into foundation activities. Sanitary sewer piping and backfill are complete, while grade beam excavation and forming continue.
At McDonald Middle School, renovations in Area E103 are complete, while work continues in the Black Box Theater.
These milestones reflect continued progress across Mesquite ISD as teams complete renovation work and advance the next phases of larger campus additions. Additional updates will be shared as projects reach new milestones.